The Development Duquesa Hills on a Natural Hill
Structure Foundations & footings - reinforced concrete, main structure is formed with reinforced concrete ribs
Roofing Curved arabesque tiling and waterproofed membrane on pitch roof with thermal insulation
Walls External walls - double brick with air cavity / insulation. Wall construction comprised of 100mm brick walls with thermal acoustic insulation to outer wall.
Flooring 'Marfil' cream ivory marble / 1º grade ceramic tiles
Bathrooms 'Melodja' sanitary ware / Grohe taps - hydro-massage bath in main bathroom.
Kitchens Fully fitted with electric appliances
Installations Pre-installation for Air Conditioning - Safe Pre-installation for Alarm |